<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"><channel><title>The Platform – Blog</title><description>Practical guides on pricing, quoting, take-offs and paperwork for builders and tradespeople.</description><link>https://theplatformbuild.com/</link><language>en</language><item><title>Contractor quote template in Finland: contents and pricing</title><link>https://theplatformbuild.com/blog/contractor-quote-template/</link><guid isPermaLink="true">https://theplatformbuild.com/blog/contractor-quote-template/</guid><description>A contractor quote template for building and renovation jobs in Finland: what to include and how to price it from quantities, labour and materials.</description><pubDate>Wed, 28 Oct 2026 00:00:00 GMT</pubDate><category>quote</category><category>pricing</category></item><item><title>How much grout, tile adhesive and concrete do I need?</title><link>https://theplatformbuild.com/blog/how-much-grout-adhesive-concrete/</link><guid isPermaLink="true">https://theplatformbuild.com/blog/how-much-grout-adhesive-concrete/</guid><description>How much grout do I need, and how much tile adhesive and concrete? Formulas for grout, adhesive, mortar and concrete volume, waste and whole bags.</description><pubDate>Wed, 28 Oct 2026 00:00:00 GMT</pubDate><category>materials</category><category>concrete</category><category>take-off</category></item><item><title>Markup vs margin in construction: formulas and table</title><link>https://theplatformbuild.com/blog/markup-vs-margin/</link><guid isPermaLink="true">https://theplatformbuild.com/blog/markup-vs-margin/</guid><description>Markup vs margin for contractors: the difference, formulas both ways, a conversion table and how to price a job with a target margin that covers overheads.</description><pubDate>Wed, 28 Oct 2026 00:00:00 GMT</pubDate><category>margin</category><category>pricing</category><category>quote</category></item><item><title>Material takeoff: how to do a quantity takeoff</title><link>https://theplatformbuild.com/blog/material-takeoff/</link><guid isPermaLink="true">https://theplatformbuild.com/blog/material-takeoff/</guid><description>How to do a material takeoff: units per item, deducting openings, adding waste, turning quantities into labour hours, and the quantities people forget.</description><pubDate>Wed, 28 Oct 2026 00:00:00 GMT</pubDate><category>takeoff</category><category>estimating</category><category>quantities</category></item><item><title>Tiling cost per m² in Finland: how to price a tiling job</title><link>https://theplatformbuild.com/blog/tiling-cost-per-m2/</link><guid isPermaLink="true">https://theplatformbuild.com/blog/tiling-cost-per-m2/</guid><description>How to work out tiling cost per m²: labour hours, tiles with waste, adhesive, grout, waterproofing and details per piece, with formulas.</description><pubDate>Wed, 28 Oct 2026 00:00:00 GMT</pubDate><category>tiling</category><category>pricing</category><category>wet rooms</category></item></channel></rss>